Foundation / Piling Construction Worker
and operating cranes and heavy equipment
• Foundation / Piling Work
• Read construction drawings and follow the foreman’s instructions
• Assist in setting up and positioning piling machines at the worksite
• Perform pile driving / pile installation work for building and civil foundations [CONFIRM
piling method: steel pipe, concrete, or other]
• Mark and measure pile positions and check depth and alignment
• Assist with pile cutting, connecting and finishing work
• Clean up and level the work area after piling
• Material Handling
• Move, carry and arrange construction materials (piles, steel pipes, rebar, plates, tools)
• Sling and hook materials for lifting, following hand signals
• Load and unload materials from trucks
• Keep materials neatly stored and organized on site
• Welding Work
• Weld pile joints and steel components as instructed [CONFIRM welding type, e.g. arc / semiautomatic, and whether a license is needed]
• Prepare welding materials and equipment, and check welds
• Follow fire prevention and welding safety rules
• Crane and Heavy Equipment
• Operate or assist cranes and heavy equipment used in piling work [CONFIRM: operation requires licenses such as slinging, small crane or heavy equipment; state if the company provides training]
• Give and follow signals during lifting operations
• Perform daily checks of equipment and report defects
• Age Requirement: 22 – 38 years old
• Educational Attainment: High School Graduate
• Must have completed a 3-year Technical Intern Training Program (TITP) in Japan
• Japanese language: certificate equivalent to JLPT N4 (required)
• Conversational Japanese around N3 level preferred
• Experience in construction, foundation, piling or welding is an advantag
2x2
Trainee Completion
Government Certificate (Sankyu Exam/Senmonkyu Exam)
Any license in Japan